Anchor: July 2026 (reports Q1–Q2 2026 data) · Registry tulsa-program-registry-v1 v1.0.0

§E · Decision layer

Model a deal

See which incentive designations actually stack on the same Tulsa parcel, test a capital stack against the typed program caps, and produce a readiness report you can take to an intake conversation. Every 3D view has a 2D accessible equivalent showing the same figures.

242 parcels analysed · every 3D view has a 2D fallback

Decision Lens

Constructability lens

Same dual-axis model as Explore: Program incentives vs site constructability. This panel previews provisional readings until the terrain pipeline publishes measured DEM/SSURGO joins.

Provisional / awaiting terrain pipeline

99208920814688

98.3 / 100 · Favorable

  • Median slope: 0.774 %
  • Soil drainage: Well drained
  • Flood constraint: see_parcel_constraints

99208920837200

90 / 100 · Favorable

  • Median slope: 3.716 %
  • Soil drainage: Water
  • Flood constraint: see_parcel_constraints

99208920837029

68.3 / 100 · Moderate

  • Median slope: 16.724 %
  • Soil drainage: Well drained
  • Flood constraint: see_parcel_constraints

99208920837100

76.7 / 100 · Favorable

  • Median slope: 13.203 %
  • Soil drainage: Well drained
  • Flood constraint: see_parcel_constraints

Constructability is decision-support only — not engineering certification, survey, or an offer of financing.

Constructability is a separate Decision Lens axis from program incentives. Scores are never averaged into F4 incentive totals. Descriptive decision-support only — not underwriting and not an offer.

Decision Lens — constructability aggregate

Decision Lens constructability aggregate: flood coordination from joined FEMA constraints plus slope/SSURGO when measured. Missing DEM or soil samples stay gated as unconfirmed — never fabricated. Parallel to the incentive Venn; does not change program math.

Parcels analysed242
Any measured factor242
Mapped flood constraint4
Slope measured12
Soils measured11
Mean composite (measured)0.944

Constructability readings are decision-support only. They reuse public DEM, SSURGO, and FEMA sources when measured; unconfirmed factors are gated and never fabricated. Not an engineering certification, survey, or flood determination.

Eligibility overlap explorer

F28 · which incentive designations actually stack on the same parcel. Membership is real joined eligibility across 242 Tulsa parcels — no modelled or illustrative counts.

Select an overlap region to list the parcels in it.

Sources: City-ownedTulsa County Assessor — ownership classification (M1 pipeline) single-sourced · QCTHUD — Qualified Census Tracts (QCT) 2026 single-sourced · EZOklahoma Dept. of Commerce (ODOC) — priority enterprise zones single-sourced

Stack Simulator

F29 · set your assumptions and see the capital stack recompute against the typed program caps. Descriptive — not an offer Decision-support, not underwriting.

Assumptions

Sources in the stack

Every input above is a labelled assumption you set. Caps, thresholds, and product maxima are typed in the program registry and applied for you — they are not editable here.

Recomputed capital stack

Capital stack under the stated assumptions — the accessible equivalent of the waterfall above. Descriptive, not an offer.
SourcePositionAmount% of costSized byStatus
THIF Project Loan PRD-290 transcript (c4cf5041) [T 41:00–41:42]Subordinate debt$5M41.7%capped by the program maximumVerifiedReconciliation-gated
THIF Project Equity & Subsidy Grant (ILT3 gap grant) PRD-290 transcript (c4cf5041) [T 42:07–42:44]Gap / grant$5M41.7%capped by the ILT3 per-project limitVerifiedReconciliation-gated
OHFA 9% LIHTC Congressional Research Service. "An Introduction to the Low-Income Housing Tax Credit." Congress.gov, Library of Congress, www.congress.gov/crs-product/RS22389. Accessed 19 July 2026.Equity / credit$1.20M10.0%capped by the program maximumVerifiedReconciliation-gated
Total sourced$11.20M93.3%
Residual gap$800K
THIF exposure (1 project)$10M
Modelled hard cost$222/sf

Saved scenarios stay in this browser only — nothing is transmitted or stored on a server.

Developer dashboard

F30 · portfolio exposure across your saved scenarios, tested against the typed THIF caps. Descriptive — not an offer

Saved scenarios are stored in this browser only (opt-in). They are never transmitted to a server, are not shared, and are lost if you clear site data.

Loading saved scenarios…

Application Readiness Report

F31 · what an intake would ask for, pre-filled from your assumptions. A readiness artifact, not a submission.

OHFA 9% LIHTC

Administered by OHFA / IRS §42 · VerifiedReconciliation-gated Congressional Research Service. "An Introduction to the Low-Income Housing Tax Credit." Congress.gov, Library of Congress, www.congress.gov/crs-product/RS22389. Accessed 19 July 2026.

Assumptions this report was built from

Your stated assumptions — these are inputs you chose, not verified project facts.
Total development cost$12M
Units60
Hard-cost floor area (land excluded)54,000 sf
Modelled hard cost$222/sf
THIF exposure modelled$10M
Residual gap$800K

Readiness steps

  1. Confirm the project fits OHFA 9% LIHTC (na position) with OHFA / IRS §42. Not determinable from these assumptions.
  2. Meet eligibility: Competitively allocated (~70% present-value subsidy). Not determinable from these assumptions.
  3. Meet eligibility: $1.2M max 9% award; HOME-based per-unit total-development-cost limit applies. 60 units modelled (assumption). AMI mix still needs confirming.
  4. Meet eligibility: Subject to OHFA QAP cost thresholds (see qap-cost-threshold constraint). Not determinable from these assumptions.
  5. Document AMI / set-aside: LIHTC set-aside (e.g. ≤60% AMI, income averaging). 60 units modelled (assumption). AMI mix still needs confirming.
  6. Confirm current program terms with the administering entity (terms shown are descriptive, not an offer). Not determinable from these assumptions.

Constraints to clear

  • P.L. 119-21 (2025) permanently raised the 9% ceiling +12% from 2026.

Caps and thresholds applied

Descriptive — not an offer This is a readiness artifact, not a submission. Confirm current terms and apply through the official THIF intake portal — nothing on this page reserves, applies for, or commits any funding.